Path: News


02.04.2004

The First of Overhaul Repair Series at the Mostecká uhelná společnost has been finished

UNEX a.s., the engineering and metallurgical complex, producer of technological systems, machinery parts and castings, finished - as one of suppliers - the first major series of big overhaul repairs in the open cast mines of the Mostecká uhelná společnost (MUS - Most Coal Company).


03.03.2004

Union agreement signed on 3 March 2004

The management of the engineering-metallurgical complex UNEX a.s. spent 5 months negotiating a union agreement. The aim of the negotiations was to change the structure of obligations towards employees. The emphasis should be shifted from social stabilization to performance stimulation.


10.02.2004

UNEX a.s. successfully finished assembly of a crucial KU 800 bucket-wheel excavator junction for Mostecká uhelná společnost (Most coal-mining company)

The engineering and metallurgical complex UNEX a.s., producer of technological systems, machinery parts and castings, is the main supplier of new parts for the overhaul repair of the K 75large-capacity excavator in Mostecká uhelná společnost.


01.10.2003

Meeting with regional representatives

The engineering-metallurgical complex UNEX a.s. – producer of technological systems, machinery parts and castings - introduced its current situation and prospects for the future to representatives of important regional institutions.

( previous page 1... 2... 3... 4... 5... 6... 7... 8... next page )

Languages


Home | Write us | Site map | Info +420 585 071 111